A resort on St. John cannot lean on a mainland water main. Reliable potable water has to be made on site.
This project was a ground-up reverse osmosis plant, a desalination plant that draws seawater from the ocean, treats it, and feeds the resort's potable-water system at 300,000 gallons a day.
Two things made it hard before the plant could take shape. St. John has no concrete plant of its own, so every load had to cross the water, and the plant needed deep, self-performed foundations to sit safely on hard coastal ground.
On an island with no concrete supply of its own, logistics decide the schedule. Here is how the plant came together.
Our own crews installed 137 deep foundation piles, then formed and poured all the pile caps and grade beams, anchoring the plant on hard coastal ground.
With no concrete plant on St. John, we moved concrete trucks and materials across by barge every day to keep the pours on schedule.
As general contractor, we carried the plant from the ground up, through to the intake and treatment system that turns seawater into potable water for the resort.
A ground-up desalination plant designed to produce 300,000 gallons of potable water a day, built to give the resort a reliable water supply it makes for itself.
It is the kind of infrastructure that lets a remote island resort run on its own, and exactly the work Stabilis is built for.
A ground-up, 126-key hotel raised five stories on unstable fill near the cruise port.
Seven four-story guest buildings painted, the model rooms rebuilt and every public space renovated, with the resort open throughout.
Our own project and field teams directly managed hurricane-recovery work across the main tower, harborside units, and the power plant.
Tell us about your site and your timeline, and we will show you how we would build it.