Seven guest buildings painted, the model rooms rebuilt, and every public space renovated. The resort never closed.

Hospitality and resortSt. Thomas, USVIRenovation
7 guest buildingsResort open throughout5 months

Project details

Location
6900 Great Bay, Nazareth, St. Thomas, USVI
Sector
Hospitality and resort
Scope
Exterior painting of 7 four-story guest buildings, model room renovation, renovation of all public spaces
Delivery method
Renovation
Our role
General contractor
Services provided
Exterior painting, model room renovation, public space renovation
Site condition
Resort open and operating throughout
Duration
5 months
Year
2024

The challenge

Painting seven four-story buildings is ordinary work on an empty site. On an open resort it is a different job.

Guests were in those buildings the whole time. They walked past the work to reach their rooms. They slept above it. Every day the job had to end in a state a paying guest could live with.

The public spaces were harder still. A resort can take a guest room offline for a week. It cannot take the lobby offline, or the pool restrooms. Those rooms carry every guest on the property, every day, and the work had to happen around them rather than instead of them.

Then the model rooms, where the standard is highest. A model room is what a buyer stands in before deciding. There is nowhere to hide a rushed finish.

Three scopes. All guest-facing. All live.

Scope

What we did

3 items of scope

Stabilis was general contractor for the full renovation program at the Ritz-Carlton Club on St. Thomas.

  • Exterior painting across all seven four-story guest buildings
  • Model room renovation, the rooms held to the closest scrutiny on the property
  • Public space renovation, including the lobby and the pool restrooms

How we delivered it

Keeping a resort open for five months of construction is a sequencing problem before it is a construction problem. Here is how Stabilis ran it.

01

One general contractor across all three scopes

Stabilis held the contract and ran the work. Paint, model rooms, and public spaces answered to the same team, so nothing fell into a gap between trades and the resort had one number to call.

02

Sequenced around guests, not around us

Painting moved building by building rather than opening the whole property at once. Public spaces were phased so the lobby and restrooms stayed usable. The resort stayed open and operating for the full program.

03

Five months, planned from the dock up

On St. Thomas every gallon of paint and every room fitting arrives by sea. We planned procurement, freight, and site delivery into the schedule from the start, which is how a five-month window on an island holds.

The result

Seven guest buildings painted. Model rooms renovated. Every public space refreshed. Delivered in five months at a Great Bay resort on St. Thomas, with the doors open the entire time.

7 guest buildings
Model rooms
All public spaces
Resort open throughout

This is the work resort owners need most. A full refresh, and not one day of lost occupancy.

Gallery

The renovated lobby, its seating and reception desks under the coffered ceiling
The renovated lobby looking towards reception, new rug, seating and lighting in place
The lobby seating area after renovation, under the painted ceiling and chandelier
The resort's pool deck and grounds from the air, the guest-room buildings around them
Aerial view of the Ritz-Carlton Club on St. Thomas, its buildings and pools along the bay

Services on this project

General Contracting

This project shows Stabilis holding general contractor responsibility across three guest-facing scopes at one operating resort.